Category Archives: 1992 DOHC GTP

1992 DOHC GTP project

Summer update

After a long summer of traveling back to Wisconsin to work on this project, Bob and I have gotten the new engine installed with a freshly machined flywheel, a new clutch and pressure plate, and assembled the whole thing with … Continue reading

Posted in 1992 DOHC GTP, Projects | Leave a comment

Moving

With this project halfway finished, I’ve gotten a new job 2,000 miles away on the west coast and have to move.

Posted in 1992 DOHC GTP, Projects | Leave a comment

Replacement Engine

Here’s the engine I’ve rebuilt for this project. Front side dual camshafts New timing belt and pulleys

Posted in 1992 DOHC GTP, Projects | Leave a comment

Dropping the engine out the bottom

With the cradle dolly positioned under the engine, the car is lifted to clear the engine and suspension: Then the engine, transmission, and front suspension are dropped out the bottom and removed on the cradle.

Posted in 1992 DOHC GTP, Projects | Leave a comment

Getting started

Disconnecting the engine and prepping for removal

Posted in 1992 DOHC GTP, Projects | Leave a comment